24kV/33kV Station-Class Arrester or Building Air Terminal — Which Does Your Substation Actually Need?

A utility procurement officer sent me a bill of quantities last year that I still use as a teaching example. Line 14 read: “Lightning arrester, 33kV, 12 pcs.” Line 15 read: “Lightning rod for control building, 4 sets.” I watched one supplier quote the same copper air terminal against both lines — and the price looked wonderful, right up until the electrical engineer opened the submittal and rejected line 14 entirely. The two lines were never the same product. They share the word “lightning” and almost nothing else, and confusing them is the most expensive vocabulary mistake I see in substation tenders.

So let me draw the boundary properly. One device stands in the open and intercepts the strike; the other bolts onto the busbar and clamps the surge that racing along the line would otherwise punch into a transformer. Most substations need both, on different lines of the BOQ, specified against different standards. Here is the decision tree I walk buyers through, and the reasoning behind each branch.

First Question: Are You Protecting the Yard, or the Equipment in It?

Q1 · What is the threat path you are designing against?
Direct strike onto the yard, masts or buildings
→ EXTERNAL LIGHTNING PROTECTION: air terminals, down-conductors, earth grid — IEC 62305 territory
Surge arriving along the line, or switching overvoltage
→ STATION-CLASS SURGE ARRESTER: metal-oxide device at the equipment terminals — IEC 60099-4

The first branch is physical. A building air terminal — the copper or copper-clad rod family, including our 33kV-marked copper-coated steel arrester rods used for mast interception duty — gives the lightning current a preferred attachment point and a designed path to the earth grid. It protects structures: control buildings, gantries, switchyard masts. A station-class surge arrester does not intercept anything; it is a nonlinear resistor that sits between line and earth at the transformer’s terminals and collapses to low impedance for the microseconds a surge lasts, clamping the voltage the equipment sees. The governing standards differ accordingly: the external system is designed per IEC 62305-3, while the surge arrester is specified per IEC 60099-4, the metal-oxide arrester standard.

Tender-desk nugget: when a BOQ line says “33kV lightning arrester”, read the specification clause before pricing. If the clause mentions continuous operating voltage, residual voltage or energy class, it is a surge arrester. If it mentions protection angle, mast height or radius, it is an air terminal. The unit price difference between quoting the right and the wrong device is not a rounding error.
33kV lightning arrester copper rod set for substation mast interceptionAir-terminal duty at a substation: interception rods on masts and the control building — the external system that gives the strike a designed path to the earth grid.

Second Question: What Voltage Class Is the System?

Only one of the two devices carries a voltage class at all, and this is where the “24kV/33kV” in your search belongs. A surge arrester is matched to the system it protects: its continuous and rated voltages must suit a 24kV or 33kV network, its energy class must absorb the duty, and its residual voltage must sit below the equipment’s insulation withstand. Those numbers are the product. A building air terminal, by contrast, has no voltage class — copper does not care whether the strike came toward a 33kV yard or a farmhouse; what matters is its interception geometry, its materials and its connection to earth. When our 24kV/33kV lightning arrester pages list a voltage mark, it identifies the substation application the rod set is packaged for — the mast interception duty at that voltage yard — not an electrical rating of the copper itself.

Because the surge arrester is a voltage-class device, I never quote one from a one-line enquiry. The datasheet conversation — system voltage, earthing arrangement, altitude, pollution class — is where a correct 24kV or 33kV selection is made, and I would rather send three questions than one wrong arrester.

Side by Side: Two Devices, Two Standards, Two Lines on the BOQ

Station-class surge arrester versus building air terminal at a 24/33kV substation
Attribute Station-class surge arrester Building air terminal (lightning rod)
Job Clamps surges arriving along the line; protects transformer and switchgear insulation Intercepts direct strikes; protects yard structures, masts and buildings
Physics Metal-oxide nonlinear resistor, µs-scale conduction Preferred attachment point plus designed current path to earth
Key standard IEC 60099-4 IEC 62305 series; components per IEC 62561-2
Rated by System voltage class (e.g. 24kV / 33kV), energy class, residual voltage Geometry (height, protection method), material, wind rating
Sits at Equipment terminals, busbar, transformer bushings Highest points: masts, roof corners, gantries
BOQ symptom when confused One device quoted against both lines — rejected at submittal, re-tendered at your cost

Notice the last row, because it is the one that costs money. I have watched contractors lose both the margin and the schedule over this confusion — and the fix at tender stage is free: read the clause, ask the question, quote the right device.

And the Earth Grid Beneath Everything?

Whichever devices you buy, both empty into the same soil. The air terminal’s down-conductors and the surge arrester’s earth lead terminate at the substation earth grid, and the grid’s performance under fault and lightning current is a design discipline of its own — touch and step potentials, conductor sizing, corrosion allowance. Because every protective device in the yard discharges into that grid, I treat the earthing conversation as part of both BOQ lines, not an afterthought beneath them; components that join conductors to the grid carry their own type tests per IEC 62561-2, and the wider system context sits in IEC 62305-1.

For the fundamentals — why any structure, substation control building included, needs a designed strike path at all — our plain-language piece on how lightning rods safeguard a building is the one I send to the non-electrical members of the project team. The wider hardware range, from yard masts to building terminals, sits in our lightning rod category, and the surge-arrester family line starts at the lightning surge arrester page.

24kV 33kV station class arrester rod for substation mast dutyMast-duty interception rod for a 24/33kV yard — geometry and fixing are the specification here, not a voltage rating.
Lightning surge arrester terminal with cross base for substation structuresTerminal with cross base for structural mounting — part of the external system that the surge arrester, indoors or at the bushing, complements rather than replaces.

How the Confusion Enters the Tender in the First Place

I have tracked this mistake back to its source more than once, and it is rarely incompetence — it is inheritance. A BOQ gets carried forward from the last project, the word “arrester” survives three rounds of copy-paste, and by the time it reaches procurement nobody on the current team wrote the line or remembers which device it meant. Because both products legitimately appear in substation documents, the ambiguous line passes every sanity check until an engineer reads the submittal. My countermeasure is unfashionably simple: on any tender I touch, I ask which device each line means before quoting, in writing. The two minutes that email takes have saved my customers more schedule pain than any discount I have ever negotiated.

Let me add the perspective of the site engineer for a moment, because I hear their side too. When the wrong device arrives, it is the site team that stores it, argues about it and waits for the replacement while the energisation date does not move. I have stood in yards where a rejected “arrester” sat in its crate for a whole rainy season, a monument to one ambiguous BOQ line. The site engineer’s version of my advice is even shorter than mine: photograph the clause, send it to the supplier, and make them state the standard number back to you. Any supplier who will not write “IEC 60099-4″ or “IEC 62305″ next to their quote has told you which device they think they are selling — and it may not be the one you think you are buying.

If you are the engineer rather than the buyer, one habit pays for itself: insist that every “arrester” line in the draft BOQ carries its governing standard in brackets. It costs the drafter ten seconds, it forces the distinction at the moment the line is written, and it turns the supplier’s question from “which did you mean?” into a checkable fact. I have started adding the bracketed standard to my own quotations for the same reason — it keeps everyone honest, me included.

What the Datasheet Conversation Looks Like When It Is Done Properly

When a buyer sends me the five fields — system voltage, earthing arrangement, altitude, pollution class, protected equipment — the selection stops being a guess and becomes a calculation. Rated and continuous operating voltage follow from the system and its earthing; the energy class follows from the duty the line can deliver; the residual voltage must tuck under the equipment’s insulation level with margin. I return the selection as a one-page document stating each value against its IEC 60099-4 basis, because I want the buyer’s engineer checking my arithmetic, not trusting my enthusiasm. On the interception side the same discipline applies: plot plan in, coverage layout out, mast heights and terminal positions stated against the protection method used. I have found that buyers remember a supplier who shows the working — and they phone that supplier first when the next substation appears on the horizon.

I will close the loop on the story I opened with. That procurement officer re-issued the two lines correctly split — surge arresters against IEC 60099-4 on one line, interception rods with the coverage layout on the other — and the resubmittal passed in a week. We supplied the terminal side; a specialist supplied the arresters against our shared datasheet notes. Nobody remembers the two-week delay now, because the file was right when it mattered. That is the whole lesson of this guide, and it is cheaper than it looks: separate the words, and the devices separate themselves. I still tell that story at the start of every substation enquiry, and I expect I will be telling it for years — the vocabulary mistake is immortal, but the two-minute question that kills it is free — and it is the best-value question in the whole tender package, bar none — ask it early, ask it in writing, always.

Finally, a word about timing. These decisions are cheapest at the desk and most expensive at the crane. The tender stage, the submittal stage and the delivery stage each multiply the cost of a confused line by an order of magnitude, which is why I push the clarification email into the first week of every enquiry I touch — before prices harden, before schedules lock, and long before anything is bolted to a busbar. In twelve years I have never once regretted asking the question early, and I have watched plenty of people regret asking it late.

Frequently Asked Questions

Can a building air terminal protect the transformer from lightning?

Only from direct attachment. The terminal keeps the strike off the equipment by taking it onto a designed path, but surges arriving along the connected lines — from a strike kilometres away — sail straight past the terminal. That is exactly the gap the station-class surge arrester fills at the transformer terminals. The two devices answer different threats, and a yard with only one of them is half protected.

Why do your 33kV pages show copper rods if a station arrester is a metal-oxide device?

Because the pages package both conversations for substation buyers. The rod sets serve the interception duty — masts and structures at a 33kV yard — and the voltage mark identifies the application, not an electrical rating of the copper. Where a project needs the metal-oxide station arrester itself, we quote it against the datasheet discussion: system voltage, earthing, energy class. One enquiry, both lines, no confusion.

What information do you need to quote a 24kV or 33kV surge arrester?

Five fields: system nominal voltage, system earthing arrangement, altitude, pollution class, and the equipment being protected. With those I can return a selection with the rated voltage, continuous operating voltage and energy class stated against IEC 60099-4 — a document your design engineer can check rather than a price with a prayer attached.

Does an ESE terminal change anything at a substation?

On the interception side, an ESE head can widen the protected volume over a yard where tall masts are impractical — the trade-offs are the same as on any structure, and my ESE-versus-Franklin comparison walks through them. On the equipment side, nothing changes: surge arresters are still needed at the transformer, whatever stands on the masts.

How many air terminals does a typical 33kV yard need?

Enough that the rolling-sphere or protective-angle construction shows no exposed equipment or structure — which depends on mast heights and yard layout, not on the voltage. A compact yard may be covered by two mast terminals; a sprawling one may need four or more. Send the plot plan and I will return the coverage layout with the arithmetic shown.

What belongs in the handover file for these devices?

For the external system: as-builts, component certificates and the measured earth reading — the same punch-list discipline as any building handover. For the surge arresters: the IEC 60099-4 type-test references, the routine test certificates per unit, and the installation torque and clearance notes. I compile both packs as standard, because the audit that finds a missing certificate always seems to land on the busiest week of the project.

Send the BOQ. Get Both Lines Quoted Correctly.

Paste the specification clauses — or just the drawings — and we return the split: interception system with coverage layout, and the surge arrester selection with the five datasheet fields stated. One envelope, two correct lines, no submittal rejections.

Start the 24/33kV Enquiry →

Jane Yang — Sales Manager, Xinchang Shibang New Material Co., Ltd.

I have spent 12 years in lightning protection and grounding foreign trade, and substation tenders are where I see the costliest vocabulary mistakes. My job on these enquiries is to make sure the word “arrester” means the same thing on your BOQ and on my packing list.